OILMIN has a fleet of low hour and well maintained equipment that has been utilized for remote civil work projects such as construction of rig pads. Typically, these sites are so remote that the first step is for our insertion crews to mobilize and clear an area for the construction of heli-pads so that construction equipment can be brought in. Given the limitations on the lifting capacity of the helicopters, the dozers and excavators need to disassembled for transportation and then reassembled on location. This is achieved by mobilizing a gantry to site to assist with the reassembly. The enormity of this task can not be underestimated and can only be achieved with a crew of experienced mechanics and operators together with heli-portable workshops. OILMIN has built up an enviable reputation as the remote site experts and to date, we have constructed 12 rig pads for international Oil companies. Our services include site rehabilitation once the drilling rig has been demobilized.